Critical Path Macintosh

Useful Sites..

Buy It on eBay on eBay

Add this item to your collection.
Keep track of your collection value over time. Ok
Loose Price Complete Price New Price Graded Price Box Only Price Manual Only Price
- - - - - -
volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare
     
Graded Box Only Manual Only
- $0.00 - $0.00 - $0.00
volume:  rare volume:  rare volume:  rare
Compare Prices
Loose Sold Listings (0)
CIB Sold Listings (0)
New Sold Listings (0)
Graded New Sold Listings (0)
Box Only Sold Listings (0)
Manual Only Sold Listings (0)
All Sold Listings

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

Click tabs to see historic sales data.
Click on a listing to see full details. Ok

Critical Path (Macintosh) Details

Genre: Action & Adventure
Release Date:
ESRB Rating: Teen
Publisher: Media Vision, Inc
Developer:
Model Number: none
Disc Count: 1 game disc
Player Count: 1 player
Also Compatible On: none
Notes: none
  
UPC: none
ASIN (Amazon): none
ePID (eBay): none
PriceCharting ID: 10021120
   
Description: Critical Path is an interactive movie with action-based sequences, in which the main character Kat has to shoot, fight, set traps etc. It also has puzzle-solving elements as you, as the wounded soldier in the Control Room, have to enter codes and push buttons to help her survive. Kat starts with nine lives. When she looses a life, the player can continue with one less life or reload an earlier part of the game (automatically saved; the game has no saving slots). When all nine lives are used up, Kat dies and Minh kills you in the Control Room. In this room you will find Minh's notebook with clues and instructions about the workings in the factory and his special traps.

More Photos: Critical Path

Main Image

 

Full Price Guide: Critical Path (Macintosh)

Loose -
Item & Box -
Item & Manual -
Complete -
New -
Graded CIB -
Graded New -
Box Only -
Manual Only -

All prices are the current market price.

Critical Path (Macintosh | Video Games) prices are based on the historic sales. The prices shown are calculated using our proprietary algorithm.
Historic sales data are completed sales with a buyer and a seller agreeing on a price. We do not factor unsold items into our prices.
Chart shows the price of Critical Path at the end of each month going back as long as we have tracked the item.

Critical Path Macintosh

FAQ | Login Don't Want Ads?

Take/Upload a Trading Card or Comic photo. Find the best match in our database


Example Photos

Great Photo
great photo example
  • Clear Photo
  • Rectangle Shaped Card
  • Minimal Background
Bad Photo = Poor Result
bad photo: blurry
  • Blurry
Bad Photo = Poor Result
bad photo: cutoff
  • Cutoff Part of Card
Bad Photo = Poor Result
bad photo: too small
  • Card Is Too Small

Best Matches

Caution: Low confidence results!
  • Verify search category
  • Take photo again
  • Search by keywords