Critical Path Macintosh

Useful Sites..

Buy It on eBay on eBay

Add this item to your collection.
Keep track of your collection value over time. Ok
Precio Suelto Precio Completo Precio Nuevo Precio Clasificado Precio de Solo Caja Precio de Solo Manual
- - - - - -
volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare
     
Clasificado Caja Solo Manual Solo
- $0.00 - $0.00 - $0.00
volume:  rare volume:  rare volume:  rare
Precios actuales
Suelto se Vende (0)
CIB se Vende (0)
Nuevo se Vende (0)
Clasificado Nuevo se Vende (0)
Caja Solo se Vende (0)
Manual Solo se Vende (0)
All se Vende

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

Click tabs to see historic sales data.
Click on a listing to see full details. Ok

Critical Path (Macintosh) Detalles

Género: Action & Adventure
Fecha de lanzamiento:
ESRB Rating: Teen
Publisher: Media Vision, Inc
Developer:
Model Number: none
Disc Count: 1 game disc
Player Count: 1 player
Also Compatible On: none
Notes: none
  
UPC: none
ASIN (Amazon): none
ePID (eBay): none
PriceCharting ID: 10021120
   
Description: Critical Path is an interactive movie with action-based sequences, in which the main character Kat has to shoot, fight, set traps etc. It also has puzzle-solving elements as you, as the wounded soldier in the Control Room, have to enter codes and push buttons to help her survive. Kat starts with nine lives. When she looses a life, the player can continue with one less life or reload an earlier part of the game (automatically saved; the game has no saving slots). When all nine lives are used up, Kat dies and Minh kills you in the Control Room. In this room you will find Minh's notebook with clues and instructions about the workings in the factory and his special traps.

Más Fotos: Critical Path

Main Image

 

Guía de Precios Completa: Critical Path (Macintosh)

Suelto -
Item & Box -
Item & Manual -
Completo -
Nuevo -
Clasificado CIB -
Clasificado Nuevo -
Solo caja -
Solo Manual -

Los precios de Critical Path para (Macintosh | Videojuegos) se actualizan diariamente para cada una de las fuentes descritas anteriormente. Los precios que se muestran son los menores para Critical Path la última vez que actualizamos.
Las ventas históricas son las ventas completadas entre un vendedor y un comprador que aceptan el precio. No contamos los artículos no vendidos en nuestros precios.
El cuadro muestra el precio de Critical Path al final de cada mes, por tanto tiempo como hayamos hecho seguimiento al artículo.
Los precios de suelto, CIB y nuevo son los precios actuales del mercado.

Critical Path Macintosh

FAQ | Iniciar Sesión Don't Want Ads?

Take/Upload a Trading Card or Comic photo. Find the best match in our database


Example Photos

Great Photo
great photo example
  • Clear Photo
  • Rectangle Shaped Card
  • Minimal Background
Bad Photo = Poor Result
bad photo: blurry
  • Blurry
Bad Photo = Poor Result
bad photo: cutoff
  • Cutoff Part of Card
Bad Photo = Poor Result
bad photo: too small
  • Card Is Too Small

Best Matches

Caution: Low confidence results!
  • Verify search category
  • Take photo again
  • Search by keywords