Critical Path Macintosh

Useful Sites..

Buy It on eBay on eBay

Add this item to your collection.
Keep track of your collection value over time. Ok
Preço Solto Preço Completo Preço Novo Preço Classificado Caixa Preço único Manual Só preço
- - - - - -
volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare
     
Classificado Caixa Apenas Manual Apenas
- $0.00 - $0.00 - $0.00
volume:  rare volume:  rare volume:  rare
Preços atuais
Solto Listas Vendidos (0)
CIB Listas Vendidos (0)
Novo Listas Vendidos (0)
Classificado Novo Listas Vendidos (0)
Caixa Apenas Listas Vendidos (0)
Manual Apenas Listas Vendidos (0)
All Listas Vendidos

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

Click tabs to see historic sales data.
Click on a listing to see full details. Ok

Critical Path (Macintosh) Detalhes

Género: Action & Adventure
Data de lançamento:
ESRB Rating: Teen
Publisher: Media Vision, Inc
Developer:
Model Number: none
Disc Count: 1 game disc
Player Count: 1 player
Also Compatible On: none
Notes: none
  
UPC: none
ASIN (Amazon): none
ePID (eBay): none
PriceCharting ID: 10021120
   
Description: Critical Path is an interactive movie with action-based sequences, in which the main character Kat has to shoot, fight, set traps etc. It also has puzzle-solving elements as you, as the wounded soldier in the Control Room, have to enter codes and push buttons to help her survive. Kat starts with nine lives. When she looses a life, the player can continue with one less life or reload an earlier part of the game (automatically saved; the game has no saving slots). When all nine lives are used up, Kat dies and Minh kills you in the Control Room. In this room you will find Minh's notebook with clues and instructions about the workings in the factory and his special traps.

Mais fotos: Critical Path

Main Image

 

Guia de Preços Completo: Critical Path (Macintosh)

Solto -
Item & Box -
Item & Manual -
Completo -
Novo -
Classificado CIB -
Classificado Novo -
Apenas caixa -
Apenas Manual -

Os preços de Critical Path para (Macintosh | Videogames) são atualizados todos os dias para cada uma das fontes enumeradas acima. Os preços exibidos são os preços mais baixos disponíveis para Critical Path na última vez em que os atualizámos.
Os dados históricos de vendas são relativos a transações concluídas mediante um preço acordado entre um comprador e um vendedor. Os nossos preços não têm em conta artigos não vendidos.
O gráfico mostra o preço de Critical Path no final de cada mês desde o momento em que começámos a seguir o artigo.
Os preços de solto, CIB e novo são os preços atuais de mercado.

Critical Path Macintosh

FAQ | Iniciar Sessão Don't Want Ads?

Take/Upload a Trading Card or Comic photo. Find the best match in our database


Example Photos

Great Photo
great photo example
  • Clear Photo
  • Rectangle Shaped Card
  • Minimal Background
Bad Photo = Poor Result
bad photo: blurry
  • Blurry
Bad Photo = Poor Result
bad photo: cutoff
  • Cutoff Part of Card
Bad Photo = Poor Result
bad photo: too small
  • Card Is Too Small

Best Matches

Caution: Low confidence results!
  • Verify search category
  • Take photo again
  • Search by keywords