Critical Path Macintosh

Useful Sites..

Buy It on eBay on eBay

Add this item to your collection.
Keep track of your collection value over time. Ok
Prix Loose Prix Complet Prix Neuf Prix Classé Boîte Juste le Prix Manuel Juste le Prix
- - - - - -
volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare
     
Classé Boîte Juste Manuel Juste
- $0.00 - $0.00 - $0.00
volume:  rare volume:  rare volume:  rare
Prix Actuels
Loose Vendus (0)
CIB Vendus (0)
Neuf Vendus (0)
Classé Neuf Vendus (0)
Boîte Juste Vendus (0)
Manuel Juste Vendus (0)
All Vendus

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

Click tabs to see historic sales data.
Click on a listing to see full details. Ok

Information de Critical Path sur (Macintosh)

Genre: Action & Adventure
Date de Sortie:
ESRB Rating: Teen
Publisher: Media Vision, Inc
Developer:
Model Number: none
Disc Count: 1 game disc
Player Count: 1 player
Also Compatible On: none
Notes: none
  
UPC: none
ASIN (Amazon): none
ePID (eBay): none
PriceCharting ID: 10021120
   
Description: Critical Path is an interactive movie with action-based sequences, in which the main character Kat has to shoot, fight, set traps etc. It also has puzzle-solving elements as you, as the wounded soldier in the Control Room, have to enter codes and push buttons to help her survive. Kat starts with nine lives. When she looses a life, the player can continue with one less life or reload an earlier part of the game (automatically saved; the game has no saving slots). When all nine lives are used up, Kat dies and Minh kills you in the Control Room. In this room you will find Minh's notebook with clues and instructions about the workings in the factory and his special traps.

Plus de photos: Critical Path

Main Image

 

Guide Complet des Prix: Critical Path (Macintosh)

Loose -
Item & Box -
Item & Manual -
Complet -
Neuf -
Classé CIB -
Classé Neuf -
Boîte Juste -
Manuel Juste -

Les prix de Critical Path sur (Macintosh | Jeux Vidéo) sont actualisés tous les jours pour chacune des sources énumérées plus haut. Les prix indiqués sont les prix demandés les plus bas de Critical Path au moment de la dernière mise à jour.
L’historique des ventes ne concerne que les ventes conclues dont le prix a été accepté par l’acheteur et le vendeur. Nous ne tenons pas compte des ventes non conclues.
Les graphiques vous indiquent le prix de Critical Path à la fin de chaque mois, ainsi que son évolution depuis que nous avons commencé à le suivre.
Les prix en loose, CEB et neufs représentent les prix du marché actuel.

Critical Path Macintosh

FAQ | Connexion Don't Want Ads?

Take/Upload a Trading Card or Comic photo. Find the best match in our database


Example Photos

Great Photo
great photo example
  • Clear Photo
  • Rectangle Shaped Card
  • Minimal Background
Bad Photo = Poor Result
bad photo: blurry
  • Blurry
Bad Photo = Poor Result
bad photo: cutoff
  • Cutoff Part of Card
Bad Photo = Poor Result
bad photo: too small
  • Card Is Too Small

Best Matches

Caution: Low confidence results!
  • Verify search category
  • Take photo again
  • Search by keywords