Critical Path Macintosh

Useful Sites..

Buy It on eBay on eBay

Add this item to your collection.
Keep track of your collection value over time. Ok
Los Prijs Compleet Prijs Nieuw Prijs Geclassificeerd Prijs Alleen Doos Prijs Alleen Handleiding Prijs
- - - - - -
volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare volume:  rare
     
Geclassificeerd Alleen Doos Alleen Handleiding
- $0.00 - $0.00 - $0.00
volume:  rare volume:  rare volume:  rare
HuidigePrijzen
Los Verkochte Producten (0)
CIB Verkochte Producten (0)
Nieuw Verkochte Producten (0)
Geclassificeerd Nieuw Verkochte Producten (0)
Alleen Doos Verkochte Producten (0)
Alleen Handleiding Verkochte Producten (0)
All Verkochte Producten

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this game and condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

No sales data for this condition

Click tabs to see historic sales data.
Click on a listing to see full details. Ok

Critical Path (Macintosh) Details

Genre: Action & Adventure
Releasedatum:
ESRB Rating: Teen
Publisher: Media Vision, Inc
Developer:
Model Number: none
Disc Count: 1 game disc
Player Count: 1 player
Also Compatible On: none
Notes: none
  
UPC: none
ASIN (Amazon): none
ePID (eBay): none
PriceCharting ID: 10021120
   
Description: Critical Path is an interactive movie with action-based sequences, in which the main character Kat has to shoot, fight, set traps etc. It also has puzzle-solving elements as you, as the wounded soldier in the Control Room, have to enter codes and push buttons to help her survive. Kat starts with nine lives. When she looses a life, the player can continue with one less life or reload an earlier part of the game (automatically saved; the game has no saving slots). When all nine lives are used up, Kat dies and Minh kills you in the Control Room. In this room you will find Minh's notebook with clues and instructions about the workings in the factory and his special traps.

Meer foto's: Critical Path

Main Image

 

Volledige Prijsgids: Critical Path (Macintosh)

Los -
Item & Box -
Item & Manual -
Compleet -
Nieuw -
Geclassificeerd CIB -
Geclassificeerd Nieuw -
Alleen Doos -
Alleen Handleiding -

Critical Path prijzen (Macintosh | Videospelletje) worden dagelijks bijgewerkt voor elke hieronder vermelde bron. De weergegeven prijzen zijn de laagste prijzen beschikbaar voor Critical Path sinds de laatste keer dat deze zijn bijgewerkt.
Historische verkoopgegevens zijn voltooide verkopen met een koper en een verkoper die het eens zijn over een prijs. We houden geen rekening met onverkochte artikelen in onze prijzen.
De grafiek toont de prijs van Critical Path aan het einde van elke maand teruggaand gedurende de hele tijd dat wij dit artikel hebben bijgehouden.
Los, CIB en Nieuw prijzen zijn de huidige marktprijs.

Critical Path Macintosh

FAQ | Aanmelden Don't Want Ads?

Take/Upload a Trading Card or Comic photo. Find the best match in our database


Example Photos

Great Photo
great photo example
  • Clear Photo
  • Rectangle Shaped Card
  • Minimal Background
Bad Photo = Poor Result
bad photo: blurry
  • Blurry
Bad Photo = Poor Result
bad photo: cutoff
  • Cutoff Part of Card
Bad Photo = Poor Result
bad photo: too small
  • Card Is Too Small

Best Matches

Caution: Low confidence results!
  • Verify search category
  • Take photo again
  • Search by keywords